Inner_Masthead_Utilities-Generic

FAQs

What are the requirements for the connection of Grid-Tied PV inverters?

Having an inverter that is tested according to international standards (i.e IEC, UK Engineering Recommendation, etc) definitely helps but is not the final determination factor in connecting to our Grid. For the completeness of the report, the LEW would need several information from the manufacturer / third party test laboratory of the inverter. Hence the qualified person responsible (in the local context, the Licensed Electrical Worker) for the connection, has to submit us a technical report to show that the various power quality requirements will be met at the PCC.

‹ Back