What are the monitoring requirements?

The Power System Operator (PSO) requires solar PV systems with an installed capacity of 1MWac and above at each site/facility to provide the total Active Power output (AC-side) of its Solar PV system(s) sampled at one-minute intervals and solar irradiance from sensor installed in close proximity to the PV panels.

For solar PV systems exceeding 10 MWac, additional requirements may be required depending on the extent of such installations.

For more detailed technical requirements, please contact EMA at EMA_PSO_EMS@ema.gov.sg.

 